PowerBridge / LandBridge

Tracked AI data center portfolio for PowerBridge / LandBridge: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does PowerBridge / LandBridge have?
Data Center Index tracks 1 data center campus with PowerBridge / LandBridge named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does PowerBridge / LandBridge have?
2 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 PowerBridge / LandBridge campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does PowerBridge / LandBridge build data centers?
Tracked PowerBridge / LandBridge campuses sit in 1 market: TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest PowerBridge / LandBridge data center?
Alpha Digital Campus in Reeves County, TX is the largest tracked PowerBridge / LandBridge campus at 2 GW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.