Crow Holdings CleanArc Central Dallas Campus
245 MW AI data center in Dallas, TX, United States — announced.
- Capacity: 245 MW
- Location: Dallas, TX, United States
- Developer: Crow Holdings / CleanArc Data Centers
- Status: announced
Crow Holdings CleanArc Central Dallas Campus is a 245 MW AI data center project located in Dallas, TX, United States, currently announced. It is being built by Crow Holdings / CleanArc Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Project description
245 MW multi-building campus on ~40 acres along the Stemmons Corridor; design of the initial 70 MW building underway with long-lead equipment procurement and substation planning; first building expected late 2027.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted