TensorWave
Tracked AI data center portfolio for TensorWave: live capex history, supplier exposure, and project map.
- Projects tracked: 2
- Total pipeline: 3 GW
Projects
- TECfusions New Kensington AI Campus, 3 GW, Upper Burrell, PA, United States · operational
- Project Matador (Fermi America HyperGrid), Amarillo, TX, United States · under construction
Frequently asked questions
- How many data centers does TensorWave have?
- Data Center Index tracks 2 data center campuses with TensorWave named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does TensorWave have?
- 3 GW across 2 tracked campuses, counting operating and pipeline sites together. Of the 1 TensorWave campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does TensorWave build data centers?
- Tracked TensorWave campuses sit in 2 markets: PA (1), TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest TensorWave data center?
- TECfusions New Kensington AI Campus in Upper Burrell, PA is the largest tracked TensorWave campus at 3 GW, currently operational. That capacity is an estimate. We modeled or inferred it, and no source states it.