- Projects tracked: 1
- Total pipeline: 40 MW
Projects
- Colovore Hutto, 40 MW, Hutto, TX, United States · permitted
Frequently asked questions
- How many data centers does Colovore have?
- Data Center Index tracks 1 data center campus with Colovore named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Colovore have?
- 40 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Colovore campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Colovore build data centers?
- Tracked Colovore campuses sit in 1 market: TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Colovore data center?