Fluidstack
AI cloud provider that builds and operates GPU clusters and data centers for AI labs. Founded in London; moved its headquarters to New York.
- Type: AI cloud provider
- Ownership: Private company
- Headquarters: New York, NY
- Founded: 2017
- Website: fluidstack.io
- Projects tracked: 4
- Total pipeline: 1.1 GW
Projects
- TeraWulf Lake Mariner Campus, 750 MW, Somerset, NY, United States · operational
- Cipher Barber Lake, 207 MW, Mitchell County, TX, United States · under construction
- Fluidstack Abernathy, 168 MW, Hale County, TX, United States · under construction
- Fluidstack Cameron County Campus, Cameron County, TX, United States · under construction
Frequently asked questions
- How many data centers does Fluidstack have?
- Data Center Index tracks 4 data center campuses with Fluidstack named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Fluidstack have?
- 1.1 GW across 4 tracked campuses, counting operating and pipeline sites together. Of the 3 Fluidstack campuses with a capacity figure, 0 are filed, 2 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Fluidstack build data centers?
- Tracked Fluidstack campuses sit in 2 markets: TX (3), NY (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Fluidstack data center?
- TeraWulf Lake Mariner Campus in Somerset, NY is the largest tracked Fluidstack campus at 750 MW, currently operational. That capacity is an estimate. We modeled or inferred it, and no source states it.