Fluidstack Abernathy
168 MW AI data center in Abernathy, TX, United States: under construction.
- Capacity: 168 MW
- Location: Abernathy, TX, United States
- Developer: Fluidstack
- Status: under construction
Fluidstack Abernathy is a 168 MW AI data center project located in Abernathy, TX, United States, currently under construction. It is being built by Fluidstack. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.
Project description
TeraWulf sold its 50.1% stake in the Abernathy JV, a 168 MW critical IT site, to a group led by Fluidstack. The sale monetizes about $450M of invested capital, and the site is described as under development.
Related data center projects
- Fluidstack Cameron County Campus, Rio Hondo, TX, United States · under construction
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
Frequently asked questions
- What is Fluidstack Abernathy?
- Fluidstack Abernathy is an AI data center project in Abernathy, Texas tracked by Data Center Index. Its status is under construction.
- Where is Fluidstack Abernathy?
- Fluidstack Abernathy is in Abernathy, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- How big is Fluidstack Abernathy?
- Data Center Index tracks Fluidstack Abernathy at 168 MW. The developer or the press states that capacity, in a source dated October 7, 2026.
- Who is building Fluidstack Abernathy?
- Fluidstack is developing Fluidstack Abernathy.
Sources
- TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to Fluidstack (investors.terawulf.com · press · 2026-07-06)
- SEC EDGAR (TeraWulf 8-K EX-99.1) (sec.gov · filing · 2025-10-28)
- TeraWulf (investors.terawulf.com · press · 2025-12-18)
- Data Center Dynamics (datacenterdynamics.com · press · 2025-10-28)