Microsoft Castroville SAT82
AI data center in Castroville, TX, United States — announced.
- Location: Castroville, TX, United States
- Developer: Microsoft
- Status: announced
- Estimated cost: $0.4B
Microsoft Castroville SAT82 is a AI data center project located in Castroville, TX, United States, currently announced. It is being built by Microsoft. The estimated build cost is $0.4B. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Project description
$400M, ~195,000 sq ft one-story data center (SAT82) at 3580 FM 471 North in Castroville; construction to begin Aug 13, 2026 and complete by 2028; joins six Microsoft data centers already in Medina County.
Related data center projects
- Microsoft Fairwater Wisconsin — 2.7 GW, Mount Pleasant, WI, United States · operational
- Microsoft Pecos (Reeves County) — 2.0 GW, Pecos, TX, United States · announced
- Azure Northern Virginia — 1.0 GW, Northern Virginia, VA, United States · operational
- Microsoft — Australia AI Expansion — 1.0 GW, Sydney, Melbourne, Canberra, Australia · operational
- Crusoe Abilene Expansion — 941 MW, Abilene, TX, United States · under construction
- Microsoft Fairwater Atlanta — 859 MW, Fayetteville, GA, United States · operational
- Microsoft — Lordstown AI Campus (Stargate Phase 1) — 600 MW, Lordstown, OH, United States · announced
- Microsoft — India AI Infrastructure (Hyderabad / Pune) — 600 MW, India · under construction