Garland Campus
200 MW AI data center in Dallas, TX, United States — under construction.
- Capacity: 200 MW
- Location: Dallas, TX, United States
- Developer: Digital Realty
- Status: under construction
- Energy source: Renewable (Utility PPA)
Garland Campus is a 200 MW AI data center project located in Dallas, TX, United States, currently under construction. It is being built by Digital Realty. Power for the facility is sourced from Renewable (Utility PPA). This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Garland Campus
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Digital Realty (DLR) — developer · dc operator · high DC exposure
Related data center projects
- Digital Realty — Project Bunkhouse — 1.8 GW, Stilesboro, GA, United States · announced
- Ashburn Campus — 300 MW, Ashburn, VA, United States · under construction
- Digital Realty UK AI Mega-Campus — 300 MW, Slough, United Kingdom · announced
- Hillsboro Campus — 150 MW, Hillsboro, OR, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction
- Hyperion AI DC (Louisiana) — 5.0 GW, Richland Parish, LA, United States · under construction
- Microsoft Fairwater Wisconsin — 3.3 GW, Mount Pleasant, WI, United States · operational
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced