Garland Campus

160 MW AI data center in Dallas, TX, United States: under construction.

Garland Campus is a 160 MW AI data center project located in Dallas, TX, United States, currently under construction. It is being built by Digital Realty. Its energy source is listed as Renewable (Utility PPA). This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.

Project description

Digital Realty's Garland campus in the Dallas metro is a high-density AI build that the city says will run more than 160 MW of critical IT load once complete, with construction scheduled from 2026. A utility renewable PPA backs it.

Public companies linked to Garland Campus

Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:

Related data center projects

Frequently asked questions

What is Garland Campus?
Garland Campus is an AI data center project in Dallas, Texas tracked by Data Center Index. Its status is under construction.
Where is Garland Campus?
Garland Campus is in Dallas, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
How big is Garland Campus?
Data Center Index tracks Garland Campus at 160 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
Who is building Garland Campus?
Digital Realty is developing Garland Campus.
When will Garland Campus come online?
The next building at Garland Campus is expected online December 31, 2027. That date is the first building going live, not the full build-out.
Which public companies are linked to Garland Campus?
Data Center Index links 1 tracked public company to Garland Campus: Digital Realty (DLR). Each is a developer, tenant or supplier with a sourced link to the project.

Sources

  1. Hoodline (hoodline.com · press · 2026-03-06)
  2. City of Garland, TX (garlandtx.gov · public record · 2018-08-08)
  3. Bisnow (bisnow.com · press · 2026-03-06)
  4. datacenterknowledge.com (press · 2018-08-08)