Stream Wilmer II Campus (DFW-C)
240 MW AI data center in Wilmer, TX, United States: under construction.
- Capacity: 240 MW
- Location: Wilmer, TX, United States
- Developer: Stream Data Centers
- Status: under construction
Stream Wilmer II Campus (DFW-C) is a 240 MW AI data center project located in Wilmer, TX, United States, currently under construction. It is being built by Stream Data Centers. This project is one of thousands of data-center facilities tracked by Data Center Index across TX, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Stream's second Wilmer hyperscale campus is 140 acres and 1.52M+ sq ft with 240 MW planned critical capacity and a 372 MW on-site substation; Stream says construction is underway.
Related data center projects
- Stream Data Centers STAMP Campus, 500 MW, Alabama, NY, United States · announced
- Stream Phoenix, 280 MW, Goodyear, AZ, United States · operational
- Stream ORDC Elk Grove Village Campus, 260 MW, Elk Grove Village, IL, United States · under construction
- Stream San Antonio III, 200 MW, San Antonio, TX, United States · operational
- Stream Data Centers Grove City Campus (Rensch Road), Grove City, OH, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
Frequently asked questions
- What is Stream Wilmer II Campus (DFW-C)?
- Stream Wilmer II Campus (DFW-C) is an AI data center project in Wilmer, Texas tracked by Data Center Index. Its status is under construction.
- Where is Stream Wilmer II Campus (DFW-C)?
- Stream Wilmer II Campus (DFW-C) is in Wilmer, Texas. Every tracked Texas campus, with counts and capacity, is at https://datacenterindex.ai/markets/texas.
- How big is Stream Wilmer II Campus (DFW-C)?
- Data Center Index tracks Stream Wilmer II Campus (DFW-C) at 240 MW. The developer or the press states that capacity, in a source dated September 19, 2026.
- Who is building Stream Wilmer II Campus (DFW-C)?
- Stream Data Centers is developing Stream Wilmer II Campus (DFW-C).
- When will Stream Wilmer II Campus (DFW-C) come online?
- The next building at Stream Wilmer II Campus (DFW-C) is expected online 2027-10. That date is the first building going live, not the full build-out.
Sources
- Data Centers Dallas - Wilmer, Texas (streamdatacenters.com · press · 2026-04-29)
- Texas Department of Licensing and Regulation (tdlr.texas.gov · public record · 2026-10-07)
- TCEQ air permit record RN111813523 (permit-search.tceq.texas.gov · public record · 2024-09-20)
- DatacenterDynamics (datacenterdynamics.com · press · 2025-09-23)