How many data centers does Crusoe / Lancium have?
Data Center Index tracks 1 data center campus with Crusoe / Lancium named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Crusoe / Lancium have?
1 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Crusoe / Lancium campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Crusoe / Lancium build data centers?
Tracked Crusoe / Lancium campuses sit in 1 market: TX (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Crusoe / Lancium data center?
Crusoe Childress Campus in TX is the largest tracked Crusoe / Lancium campus at 1 GW, currently under construction. The developer or the press states that capacity, in a source dated October 7, 2026.