DataBank
US colocation and interconnection provider operating data centers in many markets. Owned since 2016 by a DigitalBridge-led investor group; Swiss Life, EDF Invest, AustralianSuper and others have since bought stakes.
- Type: Colocation provider
- Ownership: Private, backed by DigitalBridge-led investor group
- Headquarters: Dallas, TX
- Founded: 2005
- Website: databank.com
- Projects tracked: 7
- Total pipeline: 1 GW
Projects
- DataBank Red Oak Campus, 480 MW, Red Oak, TX, United States · under construction
- DataBank Project Indo (Cartersville), 200 MW, Cartersville, GA, United States · announced
- DataBank Culpeper Campus, 192 MW, Culpeper County, VA, United States · under construction
- DataBank Lithia Springs Campus (ATL5 and ATL6), 120 MW, South Fulton, GA, United States · under construction
- DataBank / Goodman Vernon Data Center, 32 MW, Vernon, CA, United States · under construction
- DataBank DFW3 Campus, Plano, TX, United States · permitted
- DataBank Orangeburg Campus, Orangeburg, NY, United States · operational
Frequently asked questions
- How many data centers does DataBank have?
- Data Center Index tracks 7 data center campuses with DataBank named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does DataBank have?
- 1 GW across 7 tracked campuses, counting operating and pipeline sites together. Of the 5 DataBank campuses with a capacity figure, 0 are filed, 5 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does DataBank build data centers?
- Tracked DataBank campuses sit in 5 markets: GA (2), TX (2), CA (1), NY (1), VA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest DataBank data center?
- DataBank Red Oak Campus in TX is the largest tracked DataBank campus at 480 MW, currently under construction. The developer or the press states that capacity, in a source dated September 10, 2024.