DataBank Lithia Springs Campus (ATL5 and ATL6)
120 MW AI data center in South Fulton, GA, United States: under construction.
Updated
- Capacity: 120 MW
- Location: South Fulton, GA, United States
- Developer: DataBank
- Status: under construction
DataBank Lithia Springs Campus (ATL5 and ATL6) is a 120 MW AI data center project located in South Fulton, GA, United States, currently under construction. It is being built by DataBank. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Georgia.
Project description
DataBank acquired 95 acres in Lithia Springs for a 120-megawatt, 1 million sq ft data center campus of two multi-story buildings, ATL5 and ATL6, served by a 180-megawatt Georgia Power substation. The first of the two buildings was expected online by 2026.
Related data center projects
- DataBank Red Oak Campus, 480 MW, Red Oak, TX, United States · under construction
- DataBank Project Indo (Cartersville), 200 MW, Cartersville, GA, United States · announced
- DataBank Culpeper Campus, 192 MW, Culpeper County, VA, United States · under construction
- DataBank / Goodman Vernon Data Center, 32 MW, Vernon, CA, United States · under construction
- DataBank DFW3 Campus, Plano, TX, United States · permitted
- DataBank Orangeburg Campus, Orangeburg, NY, United States · operational
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
Frequently asked questions
- What is DataBank Lithia Springs Campus (ATL5 and ATL6)?
- DataBank Lithia Springs Campus (ATL5 and ATL6) is an AI data center project in South Fulton, Georgia tracked by Data Center Index. Its status is under construction.
- Where is DataBank Lithia Springs Campus (ATL5 and ATL6)?
- DataBank Lithia Springs Campus (ATL5 and ATL6) is in South Fulton, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is DataBank Lithia Springs Campus (ATL5 and ATL6)?
- Data Center Index tracks DataBank Lithia Springs Campus (ATL5 and ATL6) at 120 MW. The developer or the press states that capacity, in a source dated November 6, 2023.
- Who is building DataBank Lithia Springs Campus (ATL5 and ATL6)?
- DataBank is developing DataBank Lithia Springs Campus (ATL5 and ATL6).
- When will DataBank Lithia Springs Campus (ATL5 and ATL6) come online?
- The next building at DataBank Lithia Springs Campus (ATL5 and ATL6) is expected online 2027. That date is the first building going live, not the full build-out.
Sources
- DataBank to Develop 120 MW Atlanta Facility (commercialsearch.com · press · 2023-11-06)
- DataBank (databank.com · press · 2026-10-07)
- Databank secures $2B to build data centers (constructiondive.com · press · 2024-10-24)