NY AI Data Center Projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
- Projects tracked: 9
- Operating: 2
- Under construction: 1
- Announced / permitted: 6
- Total capacity: 3.6 GW
- Estimated investment: ~$44.7B
-
Fluidstack Lake Mariner — 750 MW, Barker, NY, United States · developer: TeraWulf · tenant: Fluidstack · operational · ~$2.2B
-
NCCS Massena Data Center Expansion — 635 MW, Massena, NY, United States · developer: North Country Colocation Services (NYDIG) · announced
-
Stream NY Campus — 500 MW, Alabama, NY, United States · developer: Stream DC · announced · ~$19.5B
-
Tesla Dojo Supercomputer — Buffalo New York — 500 MW, Buffalo, NY, United States · developer: Tesla · operational
-
TeraWulf Cayuga Data Campus (Lake Hawkeye) — 400 MW, Lansing, NY, United States · developer: TeraWulf · announced
-
Riverview Innovation and Technology Campus Data Center (Tonawanda Coke site) — 300 MW, Tonawanda, NY, United States · developer: Riverview Innovation & Technology Campus · announced · ~$2.0B
-
Ranalli Super DC Lysander Data Center — 300 MW, Lysander, NY, United States · developer: Ranalli Super DC, LLC · announced
-
Brookhaven Digital Infrastructure Facility (Yaphank) — 177 MW, Yaphank, NY, United States · developer: WF Industrial (Wildflower) · announced · ~$1.0B
-
Clay NY Fab, Clay, NY, United States · developer: Micron · under construction · ~$20.0B