Brookhaven Digital Infrastructure Facility (Yaphank)
177 MW AI data center in Yaphank, NY, United States — announced.
- Capacity: 177 MW
- Location: Yaphank, NY, United States
- Developer: WF Industrial (Wildflower)
- Status: announced
- Estimated cost: $1.0B
Brookhaven Digital Infrastructure Facility (Yaphank) is a 177 MW AI data center project located in Yaphank, NY, United States, currently announced. It is being built by WF Industrial (Wildflower). The estimated build cost is $1.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across NY, United States — covering operational, under-construction, announced, and permitted sites.
Project description
WF Industrial proposed a $1 billion, 549,000 sq ft data center converting three warehouses on 71 acres in Yaphank, projected to draw 176.6 MW from the LIPA grid; the Town of Brookhaven adopted an 18-month moratorium and the state paused permits.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted