AVAIO Digital
Develops build-to-suit, powered-shell and turnkey data center campuses with on-site power options for hyperscalers and AI users. Launched by AVAIO Capital in 2021 as AVAIO Digital Partners.
- Type: Hyperscale campus developer
- Ownership: Owned by AVAIO Capital
- Founded: 2021
- Website: avaiodigital.com
- Projects tracked: 3
- Total pipeline: 1.3 GW
Projects
- AVAIO Digital Leo Campus, 1 GW, Pulaski County, AR, United States · announced
- AVAIO Digital Appomattox (Project Hercules), 300 MW, Appomattox, VA, United States · permitted
- AVAIO Digital Taurus Data Center Hub, Brandon, MS, United States · under construction
Frequently asked questions
- How many data centers does AVAIO Digital have?
- Data Center Index tracks 3 data center campuses with AVAIO Digital named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does AVAIO Digital have?
- 1.3 GW across 3 tracked campuses, counting operating and pipeline sites together. Of the 2 AVAIO Digital campuses with a capacity figure, 0 are filed, 0 stated and 2 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does AVAIO Digital build data centers?
- Tracked AVAIO Digital campuses sit in 3 markets: AR (1), MS (1), VA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest AVAIO Digital data center?
- AVAIO Digital Leo Campus in Pulaski County, AR is the largest tracked AVAIO Digital campus at 1 GW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.