Waymo / Google — Autonomous Driving AI Training Cluster
80 MW AI data center in Mountain View, CA, United States — operational.
- Capacity: 80 MW
- Location: Mountain View, CA, United States
- Developer: Google
- Status: operational
- Energy source: Renewable
Waymo / Google — Autonomous Driving AI Training Cluster is a 80 MW AI data center project located in Mountain View, CA, United States, currently operational. It is being built by Google. Power for the facility is sourced from Renewable. This project is one of thousands of data-center facilities tracked by Data Center Index across CA, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Google's Mountain View training cluster is tracked at 80 MW and operational since 2020 on renewable supply, dedicated to Waymo's autonomous driving simulation and perception model training.
Public companies linked to Waymo / Google — Autonomous Driving AI Training Cluster
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Alphabet (GOOGL) — developer · hyperscaler
Related data center projects
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- Goodnight — 1.3 GW, Claude, TX, United States · operational
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · operational
- EcoDataCenter 1 — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced
- Google New Albany — 543 MW, New Albany, OH, United States · operational
- Google-Kairos Power AI Data Center Initiative — 500 MW, Oak Ridge, TN, United States · announced