U.S. Navy
Tracked AI data center portfolio for U.S. Navy: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 100 MW
Projects
- NAS Lemoore AI Data Center (Ameresco / CyrusOne), 100 MW, Lemoore, CA, United States · announced
Frequently asked questions
- How many data centers does U.S. Navy have?
- Data Center Index tracks 1 data center campus with U.S. Navy named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does U.S. Navy have?
- 100 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 U.S. Navy campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does U.S. Navy build data centers?
- Tracked U.S. Navy campuses sit in 1 market: CA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest U.S. Navy data center?
- NAS Lemoore AI Data Center (Ameresco / CyrusOne) in CA is the largest tracked U.S. Navy campus at 100 MW, currently announced. The developer or the press states that capacity, in a source dated October 7, 2026.