Z Squared Union County Campus
150 MW AI data center in El Dorado, AR, United States — announced.
- Capacity: 150 MW
- Location: El Dorado, AR, United States
- Developer: Z Squared Inc. (Paradox Data LLC)
- Status: announced
Z Squared Union County Campus is a 150 MW AI data center project located in El Dorado, AR, United States, currently announced. It is being built by Z Squared Inc. (Paradox Data LLC). This project is one of thousands of data-center facilities tracked by Data Center Index across AR, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Z Squared (Nasdaq: ZSQR) closed its acquisition of Paradox Data LLC, bringing the energized Union County Campus in El Dorado into its portfolio: existing interruptible Entergy Arkansas service of up to ~8.0 MW, contractual rights to adjacent land, and a phased development target of 150+ MW of AI-ready capacity via utility power and on-site generation.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted