Z Squared Union County Campus
150 MW AI data center in El Dorado, AR, United States: announced.
- Capacity: 150 MW
- Location: El Dorado, AR, United States
- Developer: Z Squared Inc. (Paradox Data LLC)
- Status: announced
Z Squared Union County Campus is a 150 MW AI data center project located in El Dorado, AR, United States, currently announced. It is being built by Z Squared Inc. (Paradox Data LLC). This project is one of thousands of data-center facilities tracked by Data Center Index across AR, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Z Squared (Nasdaq: ZSQR) closed its acquisition of Paradox Data LLC, adding the energized Union County Campus in El Dorado to its portfolio. The site has existing interruptible Entergy Arkansas service of up to about 8.0 MW and contractual rights to adjacent land. The phased development target is 150+ MW of AI-ready capacity from utility power and on-site generation.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Z Squared Union County Campus?
- Z Squared Union County Campus is an AI data center project in El Dorado, Arkansas tracked by Data Center Index. Its status is announced.
- Where is Z Squared Union County Campus?
- Z Squared Union County Campus is in El Dorado, Arkansas. Every tracked Arkansas campus, with counts and capacity, is at https://datacenterindex.ai/markets/arkansas.
- How big is Z Squared Union County Campus?
- Data Center Index tracks Z Squared Union County Campus at 150 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Z Squared Union County Campus?
- Z Squared Inc. (Paradox Data LLC) is developing Z Squared Union County Campus.
Sources
- Z Squared Acquires Energized Arkansas Campus to Advance AI Infrastructure Strategy (finanznachrichten.de · press · 2026-09-09)
- PR Newswire (Z Squared Inc. release) (prnewswire.com · press · 2026-09-09)