Monarch Energy

Tracked AI data center portfolio for Monarch Energy: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Monarch Energy have?
Data Center Index tracks 1 data center campus with Monarch Energy named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Monarch Energy have?
1.4 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Monarch Energy campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Monarch Energy build data centers?
Tracked Monarch Energy campuses sit in 1 market: IL (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Monarch Energy data center?
Monarch Rock Air Data Center Campus (Rockford) in IL is the largest tracked Monarch Energy campus at 1.4 GW, currently announced. The developer or the press states that capacity, in a source dated July 1, 2026.