MCD 7 LLC

Tracked AI data center portfolio for MCD 7 LLC: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does MCD 7 LLC have?
Data Center Index tracks 1 data center campus with MCD 7 LLC named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does MCD 7 LLC have?
750 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 MCD 7 LLC campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does MCD 7 LLC build data centers?
Tracked MCD 7 LLC campuses sit in 1 market: PA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest MCD 7 LLC data center?
Project Laurel (Limerick) in Limerick Township, PA is the largest tracked MCD 7 LLC campus at 750 MW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.