MCD 7 LLC
Tracked AI data center portfolio for MCD 7 LLC: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 750 MW
Projects
- Project Laurel (Limerick), 750 MW, Limerick Township, PA, United States · announced
Frequently asked questions
- How many data centers does MCD 7 LLC have?
- Data Center Index tracks 1 data center campus with MCD 7 LLC named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does MCD 7 LLC have?
- 750 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 MCD 7 LLC campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does MCD 7 LLC build data centers?
- Tracked MCD 7 LLC campuses sit in 1 market: PA (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest MCD 7 LLC data center?
- Project Laurel (Limerick) in Limerick Township, PA is the largest tracked MCD 7 LLC campus at 750 MW, currently announced. That capacity is an estimate. We modeled or inferred it, and no source states it.