Brightseat Tech Park (Landover Mall site)
820 MW AI data center in Landover, MD, United States: permitted.
- Capacity: 820 MW
- Location: Landover, MD, United States
- Developer: Lerner Enterprises
- Status: permitted
- Estimated cost: $5B
Brightseat Tech Park (Landover Mall site) is a 820 MW AI data center project located in Landover, MD, United States, currently permitted. It is being built by Lerner Enterprises. The estimated build cost is $5B. This project is one of thousands of data-center facilities tracked by Data Center Index across MD, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Lerner Enterprises has proposed the $5 billion Brightseat Tech Park at the former Landover Mall. It would have five facilities spanning 4.1 million sq ft on the 87-acre site and could use up to 820 MW. Construction hadn't been fully approved.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Brightseat Tech Park (Landover Mall site)?
- Brightseat Tech Park (Landover Mall site) is an AI data center project in Landover, Maryland tracked by Data Center Index. Its status is permitted.
- Where is Brightseat Tech Park (Landover Mall site)?
- Brightseat Tech Park (Landover Mall site) is in Landover, Maryland. Every tracked Maryland campus, with counts and capacity, is at https://datacenterindex.ai/markets/maryland.
- How big is Brightseat Tech Park (Landover Mall site)?
- Data Center Index tracks Brightseat Tech Park (Landover Mall site) at 820 MW, on an estimated $5B build. The developer or the press states that capacity, in a source dated July 30, 2026.
- Who is building Brightseat Tech Park (Landover Mall site)?
- Lerner Enterprises is developing Brightseat Tech Park (Landover Mall site).
Sources
- Prince George's Residents Speak Out Against Proposed Landover Data Center (washingtoninformer.com · press · 2025-09-11)
- AfroTech (afrotech.com · press · 2025-09-18)
- Nature Forward (natureforward.org · press · 2026-07-30)
- Coalition for Smarter Growth (smartergrowth.net · press · 2026-10-07)
- Lawmakers Pause Data Center Development in Maryland County in Wake of $5B Megaproject (commercialobserver.com · press · 2025-09-16)
- Data Center Dynamics (datacenterdynamics.com · press · 2025-09-18)