Creekstone Energy
Tracked AI data center portfolio for Creekstone Energy: live capex history, supplier exposure, and project map.
- Projects tracked: 1
- Total pipeline: 4.6 GW
Projects
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
Frequently asked questions
- How many data centers does Creekstone Energy have?
- Data Center Index tracks 1 data center campus with Creekstone Energy named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Creekstone Energy have?
- 4.6 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Creekstone Energy campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Creekstone Energy build data centers?
- Tracked Creekstone Energy campuses sit in 1 market: UT (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Creekstone Energy data center?
- Creekstone Delta Gigasite in UT is the largest tracked Creekstone Energy campus at 4.6 GW, currently under construction. The developer or the press states that capacity, in a source dated September 21, 2026.