Creekstone Energy

Tracked AI data center portfolio for Creekstone Energy: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Creekstone Energy have?
Data Center Index tracks 1 data center campus with Creekstone Energy named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Creekstone Energy have?
4.6 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 Creekstone Energy campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Creekstone Energy build data centers?
Tracked Creekstone Energy campuses sit in 1 market: UT (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Creekstone Energy data center?
Creekstone Delta Gigasite in UT is the largest tracked Creekstone Energy campus at 4.6 GW, currently under construction. The developer or the press states that capacity, in a source dated September 21, 2026.