DataVolt
Tracked AI data center portfolio for DataVolt: live capex history, supplier exposure, and project map.
- Projects tracked: 2
- Total pipeline: 1.5 GW
Projects
- NEOM Oxagon Net-Zero AI Data Center (Saudi Arabia), 1.5 GW, Oxagon, Saudi Arabia · under construction
- DataVolt Tashkent AI Data Center, 12 MW, Tashkent, Uzbekistan · under construction
Frequently asked questions
- How many data centers does DataVolt have?
- Data Center Index tracks 2 data center campuses with DataVolt named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does DataVolt have?
- 1.5 GW across 2 tracked campuses, counting operating and pipeline sites together. Of the 2 DataVolt campuses with a capacity figure, 0 are filed, 2 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does DataVolt build data centers?
- Tracked DataVolt campuses sit in 2 markets: Saudi Arabia (1), Uzbekistan (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest DataVolt data center?
- NEOM Oxagon Net-Zero AI Data Center (Saudi Arabia) in Saudi Arabia is the largest tracked DataVolt campus at 1.5 GW, currently under construction. The developer or the press states that capacity, in a source dated August 31, 2026.