MGX/Mistral AI Campus (Paris Region)
1.4 GW AI data center in France — announced.
- Capacity: 1.4 GW
- Location: France
- Developer: MGX
- Status: announced
- Energy source: French low-carbon grid context; high-voltage grid interface procurement reported
MGX/Mistral AI Campus (Paris Region) is a 1.4 GW AI data center project located in France, currently announced. It is being built by MGX. Power for the facility is sourced from French low-carbon grid context; high-voltage grid interface procurement reported. This project is one of thousands of data-center facilities tracked by Data Center Index across France — covering operational, under-construction, announced, and permitted sites.
Project description
MGX, Bpifrance, Mistral AI, and NVIDIA announced a landmark joint venture to develop Europe's largest AI campus near Paris, with a planned capacity of 1.4 GW. The project reflects a new model for sovereign AI infrastructure: MGX provides Gulf capital, Bpifrance anchors EU sovereign interest, Mistral AI drives model development, and NVIDIA supplies next-gen GPU infrastructure. France's nuclear-dominated grid (~70% nuclear) provides low-carbon, reliable, cheap industrial power. First phases expected 2027, full capacity by 2030.
Public companies linked to MGX/Mistral AI Campus (Paris Region)
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- NVIDIA (NVDA) — developer · semiconductor
- Prysmian Group (PRYMF) — hv cable · power equipment · mid DC exposure
Related data center projects
- SoftBank France AI Data Center Capacity Program — 5.0 GW, France · announced
- EDF / OpCore Montereau AI Data Center — 700 MW, France · announced
- Lille AI Factory — 240 MW, Lille, France, France · under construction
- Scaleway — AION 'AI Gigafactory' — 200 MW, Montereau-Fault-Yonne, France · announced
- PA10x Paris — 62 MW, Paris, France, France · under construction
- Scaleway — H100 AI Cloud Data Center (France) — 40 MW, Saint-Ouen-l'Aumone, France · operational
- Mistral Compute / Eclairion Bruyeres-le-Chatel AI Cluster — 40 MW, Bruyeres-le-Chatel, France · operational
- Scaleway — DC5 (PAR2) AI Hub — 20 MW, Saint-Ouen-l'Aumône, France · operational