Mistral AI
Tracked AI data center portfolio for Mistral AI: campuses, partners and project map.
- Projects tracked: 2
- Total pipeline: 1.4 GW
Projects
- Campus AI (Fouju), 1.4 GW, Fouju, France · under construction
- EcoDataCenter 2, 48 MW, Borlänge, Sweden · under construction
- Mistral Compute / Eclairion Bruyeres-le-Chatel AI Cluster, 44 MW, Bruyeres-le-Chatel, France · operational
Frequently asked questions
- How many data centers does Mistral AI have?
- Data Center Index tracks 2 data center campuses with Mistral AI named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
- How much data center capacity does Mistral AI have?
- 1.4 GW across 2 tracked campuses, counting operating and pipeline sites together. Of the 3 Mistral AI campuses with a capacity figure, 0 are filed, 2 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
- Where does Mistral AI build data centers?
- Tracked Mistral AI campuses sit in 2 markets: France (2), Sweden (1). The figure in brackets is how many campuses Data Center Index tracks in each.
- What is the largest Mistral AI data center?
- Campus AI (Fouju) in France is the largest tracked Mistral AI campus at 1.4 GW, currently under construction. The developer or the press states that capacity, in a source dated May 19, 2025.