EcoDataCenter 2
48 MW AI data center in Borlänge, Sweden: under construction.
Updated
- Capacity: 48 MW
- Location: Borlänge, Sweden
- Developer: Mistral AI
- Status: under construction
EcoDataCenter 2 is a 48 MW AI data center project located in Borlänge, Sweden, currently under construction. It is being built by Mistral AI. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Sweden.
Notes
Users: Mistral AI
Related data center projects
- Mistral Compute / Eclairion Bruyeres-le-Chatel AI Cluster, 44 MW, Bruyeres-le-Chatel, France · operational
- Microsoft Sweden Central AI Infrastructure, 500 MW, Gävle, Sweden · operational
- Meta Luleå, Sweden AI Data Center Campus, 300 MW, Luleå, Sweden · operational
- EcoDataCenter Borlänge AI Mega Campus, 250 MW, Borlänge, Sweden · under construction
- Amazon Web Services EU-NORTH-1 Stockholm Region, 150 MW, Stockholm, Sweden · operational
Frequently asked questions
- What is EcoDataCenter 2?
- EcoDataCenter 2 is a phase of an AI data center campus in Borlänge, Sweden tracked by Data Center Index. Its status is under construction.
- Where is EcoDataCenter 2?
- EcoDataCenter 2 is in Borlänge, Sweden.
- How big is EcoDataCenter 2?
- Data Center Index tracks EcoDataCenter 2 at 48 MW. That capacity is an estimate. We modeled or inferred it, and no source states it. That figure covers one phase of the campus, not the whole site.
- Who is building EcoDataCenter 2?
- Mistral AI is developing EcoDataCenter 2.
- When will EcoDataCenter 2 come online?
- The next building at EcoDataCenter 2 is expected online June 30, 2027. That date is the first building going live, not the full build-out.
Sources
- EcoDataCenter breaks ground on mega campus in Borlänge (ecodatacenter.tech · press · 2025-09-24)
- EcoDataCenter (ecodatacenter.tech · press · 2025-09-24)