MGX

Tracked AI data center portfolio for MGX: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does MGX have?
Data Center Index tracks 1 data center campus with MGX named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does MGX have?
1.4 GW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 MGX campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does MGX build data centers?
Tracked MGX campuses sit in 1 market: France (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest MGX data center?
MGX/Mistral AI Campus (Paris Region) in Fouju, France is the largest tracked MGX campus at 1.4 GW, currently under construction. The developer or the press states that capacity, in a source dated May 19, 2025.