Google Project Tembo (Cheyenne)
2.7 GW AI data center in Cheyenne, WY, United States — announced.
- Capacity: 2.7 GW
- Location: Cheyenne, WY, United States
- Developer: Google
- Status: announced
- Estimated cost: $17.0B
Google Project Tembo (Cheyenne) is a 2.7 GW AI data center project located in Cheyenne, WY, United States, currently announced. It is being built by Google. The estimated build cost is $17.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across WY, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Google was identified as the owner behind Project Tembo, Wyoming's largest data center, a 2.7 GW campus in Cheyenne.
Related data center projects
- Nebraska Mega-Campus — 2.7 GW, Lincoln, NE, United States · announced
- Goodnight — 1.3 GW, Claude, TX, United States · under construction
- Google Morgan County Data Center (Project Louie) — 1.2 GW, Monrovia, IN, United States · under construction
- Google Fort Wayne — 1.0 GW, Fort Wayne, IN, United States · operational
- EcoDataCenter 1 — 1.0 GW, Fort Wayne, IN, United States · under construction
- Gemini Cluster (Iowa) — 1.0 GW, Council Bluffs, IA, United States · operational
- Wilbarger Campus — 800 MW, Vernon, TX, United States · announced
- Google Pine Island AI Data Center (Minnesota) — 600 MW, Pine Island, MN, United States · announced