Fairfield Energy Center
1.3 GW AI data center in Millersport, OH, United States: announced.
- Capacity: 1.3 GW
- Location: Millersport, OH, United States
- Developer: Advanced Power
- Status: announced
Fairfield Energy Center is a 1.3 GW AI data center project located in Millersport, OH, United States, currently announced. It is being built by Advanced Power. This project is one of thousands of data-center facilities tracked by Data Center Index across OH, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Vantage proposes Fairfield Energy Center, an approximately 1,300 MW natural gas and battery storage plant on about 100 acres next to the Millersport data center campus, not connected to the regional grid.
Related data center projects
- Stratos Hyperscale Data Center, 9 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Fairfield Energy Center?
- Fairfield Energy Center is a power generation asset feeding AI data center demand in Millersport, Ohio tracked by Data Center Index. Its status is announced.
- Where is Fairfield Energy Center?
- Fairfield Energy Center is in Millersport, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- How big is Fairfield Energy Center?
- Data Center Index tracks Fairfield Energy Center at 1.3 GW. The developer or the press states that capacity. This entry is a power generation asset, not a data center hall.
- Who is building Fairfield Energy Center?
- Advanced Power is developing Fairfield Energy Center.
Sources
- Millersport Campus FAQ (vantagemillersportcampus.com · press · 2026-07-21)
- Fairfield Energy Center project information (fairfieldenergycenter.com · press · 2026-09-25)