Stock Farm Road 3 GW AI Data Center (South Korea)
3 GW AI data center in Haenam County, South Korea: announced.
- Capacity: 3 GW
- Location: Haenam County, South Korea
- Developer: Stock Farm Road
- Status: announced
- Estimated cost: $10.4B
- Energy source: Grid (planned mix with advanced cooling)
Stock Farm Road 3 GW AI Data Center (South Korea) is a 3 GW AI data center project located in Haenam County, South Korea, currently announced. It is being built by Stock Farm Road. The estimated build cost is $10.4B. The site is grid-powered (planned mix with advanced cooling). This project is one of thousands of data-center facilities tracked by Data Center Index across South Korea, covering operational, under-construction, announced, and permitted sites.
Project description
Stock Farm Road, Inc. signed an MOU with Jeollanam-do authorities in early 2025 to build a 3 GW AI compute campus. The multiyear project could need up to $35 billion of investment to outfit the South Jeolla site with liquid cooling, resilient grid interconnections and modular buildings sized for large GPU clusters.
Related data center projects
- SK Group–AWS Ulsan AI Data Center (South Korea), 1 GW, Ulsan, South Korea · under construction
- Amazon Web Services Seoul Region (AP Northeast 2), 250 MW, Seoul, South Korea · operational
- Google Cloud South Korea (Seoul) Region, 200 MW, Seoul, South Korea · announced
- Microsoft Azure Korea Central Region (Seoul), 200 MW, Seoul, South Korea · operational
- Naver Chuncheon Data Center (Gak), 40 MW, Chuncheon, South Korea · operational
- Kakao KakaoCloud AI Data Center, 40 MW, Ansan, South Korea · operational
- Naver B200 4K AI Cluster, 40 MW, Seoul, South Korea · operational
- Pyeongtaek P4, Pyeongtaek, South Korea, South Korea · under construction
Frequently asked questions
- What is Stock Farm Road 3 GW AI Data Center (South Korea)?
- Stock Farm Road 3 GW AI Data Center (South Korea) is an AI data center project in Haenam County, South Korea tracked by Data Center Index. Its status is announced.
- Where is Stock Farm Road 3 GW AI Data Center (South Korea)?
- Stock Farm Road 3 GW AI Data Center (South Korea) is in Haenam County, South Korea.
- How big is Stock Farm Road 3 GW AI Data Center (South Korea)?
- Data Center Index tracks Stock Farm Road 3 GW AI Data Center (South Korea) at 3 GW, on an estimated $10.4B build. The developer or the press states that capacity, in a source dated February 27, 2025.
- Who is building Stock Farm Road 3 GW AI Data Center (South Korea)?
- Stock Farm Road is developing Stock Farm Road 3 GW AI Data Center (South Korea).
- When will Stock Farm Road 3 GW AI Data Center (South Korea) come online?
- The next building at Stock Farm Road 3 GW AI Data Center (South Korea) is expected online December 31, 2028. That date is the first building going live, not the full build-out.
Sources
- AI Data Center Index facility profile: Stock Farm Road Ai Data Center South Korea (aidci · aggregator · 2026-04-29)
- Capacity Media (capacitymedia.com · press · 2026-09-20)
- Interesting Engineering (interestingengineering.com · press · 2025-02-24)
- Brian Koo announces USD $35bn AI data hub in South Korea (datacenternews.asia · press · 2025-02-21)
- Segye Ilbo (segye.com · press · 2025-02-27)
- Stock Farm Road (stockfarmroad.com · press · 2026-09-12)
- tomshardware.com (press · 2025-02-24)
- The Korea Herald (koreaherald.com · press · 2025-02-21)
- upi.com (press · 2025-02-27)
- computerweekly.com (press · 2025-02-27)