Stock Farm Road 3 GW AI Data Center (South Korea)
3.0 GW AI data center in Muan County (planned), South Korea — announced.
- Capacity: 3.0 GW
- Location: Muan County (planned), South Korea
- Developer: Stock Farm Road
- Status: announced
- Energy source: Grid (planned mix with advanced cooling)
Stock Farm Road 3 GW AI Data Center (South Korea) is a 3.0 GW AI data center project located in Muan County (planned), South Korea, currently announced. It is being built by Stock Farm Road. Power for the facility is sourced from Grid (planned mix with advanced cooling). This project is one of thousands of data-center facilities tracked by Data Center Index across South Korea — covering operational, under-construction, announced, and permitted sites.
Project description
Stock Farm Road, Inc. signed an early-2025 MOU with Jeollanam-do authorities to build a 3 GW AI compute campus, one of the most ambitious proposals in the global pipeline. The multiyear project could require up to $35 billion of investment to outfit the South Jeolla site with cutting-edge liquid cooling, resilient grid interconnections, and modular buildings sized for massive GPU clusters.
Related data center projects
- SK Group–AWS Ulsan AI Data Center (South Korea) — 1.0 GW, Ulsan, South Korea · announced
- Amazon Web Services — Seoul Region (AP Northeast 2) — 250 MW, Seoul, South Korea · operational
- Naver — Chuncheon Data Center (Gak) — 100 MW, Chuncheon, South Korea · operational
- Kakao — KakaoCloud AI Data Center — 80 MW, Ansan, South Korea · operational
- Naver — B200 4K AI Cluster — 40 MW, Sejong, South Korea · operational
- Pyeongtaek P4, Pyeongtaek, South Korea, South Korea · under construction
- M15X HBM Fab, Cheongju, South Korea, South Korea · under construction