Naver — B200 4K AI Cluster
40 MW AI data center in Sejong, South Korea — operational.
- Capacity: 40 MW
- Location: Sejong, South Korea
- Developer: Naver Cloud
- Status: operational
Naver — B200 4K AI Cluster is a 40 MW AI data center project located in Sejong, South Korea, currently operational. It is being built by Naver Cloud. This project is one of thousands of data-center facilities tracked by Data Center Index across South Korea — covering operational, under-construction, announced, and permitted sites.
Related data center projects
- Stock Farm Road 3 GW AI Data Center (South Korea) — 3.0 GW, Muan County (planned), South Korea · announced
- SK Group–AWS Ulsan AI Data Center (South Korea) — 1.0 GW, Ulsan, South Korea · announced
- Amazon Web Services — Seoul Region (AP Northeast 2) — 250 MW, Seoul, South Korea · operational
- Google Cloud — South Korea (Seoul) Region — 200 MW, Seoul, South Korea · operational
- Microsoft Azure — Korea Central Region (Seoul) — 200 MW, Seoul, South Korea · operational
- Naver — Chuncheon Data Center (Gak) — 40 MW, Chuncheon, South Korea · operational
- Kakao — KakaoCloud AI Data Center — 40 MW, Ansan, South Korea · operational
- Pyeongtaek P4, Pyeongtaek, South Korea, South Korea · under construction