Pyeongtaek P4
AI data center in Pyeongtaek, South Korea, South Korea — under construction.
- Location: Pyeongtaek, South Korea, South Korea
- Developer: Samsung
- Status: under construction
- Estimated cost: $15.0B
Pyeongtaek P4 is a AI data center project located in Pyeongtaek, South Korea, South Korea, currently under construction. It is being built by Samsung. The estimated build cost is $15.0B. This project is one of thousands of data-center facilities tracked by Data Center Index across South Korea — covering operational, under-construction, announced, and permitted sites.
Public companies linked to Pyeongtaek P4
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Samsung Electronics (SSNLF) — developer · chip fab
Related data center projects
- Taylor Fab, Taylor, TX, United States · under construction
- Stock Farm Road 3 GW AI Data Center (South Korea) — 3.0 GW, Muan County (planned), South Korea · announced
- SK Group–AWS Ulsan AI Data Center (South Korea) — 1.0 GW, Ulsan, South Korea · announced
- Amazon Web Services — Seoul Region (AP Northeast 2) — 250 MW, Seoul, South Korea · operational
- Naver — Chuncheon Data Center (Gak) — 100 MW, Chuncheon, South Korea · operational
- Kakao — KakaoCloud AI Data Center — 80 MW, Ansan, South Korea · operational
- Naver — B200 4K AI Cluster — 40 MW, Sejong, South Korea · operational
- M15X HBM Fab, Cheongju, South Korea, South Korea · under construction