The Supplier Map: Data Center Projects Matched to Public Suppliers
69 of 715 tracked AI data center projects have at least one sourced public-supplier link, covering 37.8 GW of capacity across 43 listed companies and 196 sourced links. Owner-side roles (developer, tenant, investor) are excluded. This maps the supply chain below the hyperscaler, not the hyperscaler itself.
-
Microsoft Fairwater Wisconsin, Mount Pleasant, WI, operated by Microsoft.
Public suppliers: ANET (networking), SBGSF (transformer ups), AAOI (optical transceiver), CIEN (interconnect), COHR (optical transceiver), NVT (enclosures cooling), ETN (transformer switchgear), J (engineering), LITE (optical transceiver), ABBNY (transformer switchgear), CMI (genset), EMR (power management), MOD (liquid cooling), JCI (hvac), MU (memory supplier), 000660.KS (memory supplier)
-
Meta Prometheus, New Albany, OH, 1 GW, operated by Meta.
Public suppliers: SBGSF (transformer ups), EME (electrical designer), ANET (networking), AVGO (networking asic), CIEN (interconnect), HUBB (electrical components), COHR (optical transceiver), ETN (transformer switchgear), ABBNY (transformer switchgear), PWR (electrical designer), CMI (genset), MOD (liquid cooling), MU (memory supplier), 000660.KS (memory supplier), AEP (energy supplier)
-
OpenAI Stargate Abilene, Abilene, TX, 1.2 GW, operated by Crusoe.
Public suppliers: SBGSF (transformer ups), ANET (networking), POWL (switchgear), AVGO (networking asic), NVT (enclosures cooling), PRIM (engineering), PWR (electrical designer), CAT (genset), GEV (turbines grid), VRT (liquid cooling), TT (liquid cooling), MU (memory supplier), 000660.KS (memory supplier), ETN (transformer switchgear)
-
Amazon Mattameade Tech Campus, Woodford, VA, 770 MW, operated by Amazon Web Services.
Public suppliers: POWL (switchgear), SBGSF (transformer ups), EME (electrical designer), AAOI (optical transceiver), CIEN (interconnect), HUBB (electrical components), ETN (transformer switchgear), ABBNY (transformer switchgear), CAT (genset), CMI (genset), JCI (hvac), TT (hvac), MU (memory supplier), 000660.KS (memory supplier)
-
Azure Northern Virginia, Northern Virginia, VA, 1 GW, operated by Microsoft.
Public suppliers: ANET (networking), EME (electrical designer), CIEN (interconnect), HUBB (electrical components), CRDO (interconnect), ETN (transformer switchgear), ABBNY (transformer switchgear), PWR (electrical designer), CMI (genset), MOD (cooling), JCI (building systems), MU (memory supplier), 000660.KS (memory supplier)
-
AWS Project Rainier (New Carlisle), New Carlisle, IN, 2.2 GW, operated by Amazon Web Services.
Public suppliers: EME (electrical designer), AAOI (optical transceiver), AVGO (networking asic), HUBB (electrical components), COHR (optical transceiver), CRDO (interconnect), CMI (genset), MU (memory supplier), 000660.KS (memory supplier), TT (hvac), AEP (energy supplier)
-
Google New Albany, New Albany, OH, 250 MW, operated by Google.
Public suppliers: SBGSF (transformer ups), EME (electrical designer), AVGO (networking asic), COHR (optical transceiver), NVT (enclosures cooling), CRDO (interconnect), LITE (optical transceiver), ABBNY (transformer switchgear), PWR (electrical designer), MU (memory supplier), 000660.KS (memory supplier)
-
Meta Hyperion, Holly Ridge, LA, 5 GW, operated by Meta.
Public suppliers: ANET (networking), AVGO (networking asic), COHR (optical transceiver), LITE (optical transceiver), GEV (turbines grid), MOD (liquid cooling), MU (memory supplier), 000660.KS (memory supplier), CAT (genset)
-
Microsoft Fairwater Atlanta, Fayetteville, GA, 636 MW, operated by QTS Data Centers.
Public suppliers: SBGSF (transformer ups), AAOI (optical transceiver), NVT (enclosures cooling), J (engineering), MOD (liquid cooling), JCI (hvac), MU (memory supplier), 000660.KS (memory supplier)
-
Crusoe Abilene Expansion, Abilene, TX, 900 MW, operated by Crusoe.
Public suppliers: PRIM (engineering), CAT (genset), GEV (turbines grid), MU (memory supplier), 000660.KS (memory supplier)
-
Colossus 1, Memphis, TN, 340 MW, operated by SpaceXAI.
Public suppliers: SMCI (ai server), VRT (liquid cooling), TT (liquid cooling), MU (memory supplier), 000660.KS (memory supplier)
-
Google Council Bluffs (East), Council Bluffs, IA, 237 MW, operated by Google.
Public suppliers: NVT (enclosures cooling), LITE (optical transceiver), CMI (genset), MU (memory supplier), 000660.KS (memory supplier)
-
Amazon Madison Mega Site, Canton, MS, 284 MW, operated by Amazon Web Services.
Public suppliers: CRDO (interconnect), TT (hvac), MU (memory supplier), 000660.KS (memory supplier)
-
Google Omaha, Omaha, NE, 237 MW, operated by Google.
Public suppliers: AVGO (networking asic), CIEN (interconnect), LITE (optical transceiver)
-
Colossus 2, Memphis, TN, operated by SpaceXAI.
Public suppliers: SMCI (ai server), VRT (liquid cooling), TSLA (energy storage)
-
Meta–Vistra Nuclear Uprate Agreement (OH/PA), Perry, OH, 2.1 GW, operated by Meta.
Public suppliers: PWR (electrical designer), VST (energy supplier)
-
NEOM Oxagon Net-Zero AI Data Center (Saudi Arabia), Oxagon, 1.5 GW, operated by DataVolt.
Public suppliers: SMCI (ai server), PRYMF (hv cable)
-
OpenAI Stargate Shackelford, Shackelford County, TX, 1.4 GW, operated by Vantage Data Centers.
Public suppliers: POWL (switchgear), GEV (turbines grid)
-
MGX/Mistral AI Campus (Paris Region), Fouju, 1.4 GW, operated by MGX.
Public suppliers: PRYMF (hv cable), NVDA (gpu)
-
Lancaster County DC, Lancaster County, PA, 300 MW, operated by Chirisa Technology Parks / Machine Investment Group.
Public suppliers: GNRC (genset), VRT (liquid cooling)
-
Vistra's Comanche Peak Nuclear Data Center Campus, Glen Rose, TX, operated by Amazon Web Services.
Public suppliers: EMR (power management), VST (energy supplier)
-
ExxonMobil's 1.5GW Data Center Power Plant Initiative, TX, 1.5 GW, operated by ExxonMobil.
Public suppliers: EMR (power management)
-
Romania Black Sea AI Gigafactory, Cernavodă, 1.5 GW, operated by EU EuroHPC & Romanian Consortium.
Public suppliers: PRYMF (hv cable)
-
Start Campus Sines Data Campus, Sines, 1.2 GW, operated by Start Campus.
Public suppliers: PRYMF (hv cable)
-
OpenAI Stargate Michigan, Saline Township, MI, 1 GW, operated by Related Digital.
Public suppliers: DTE (energy supplier)
-
OpenAI Stargate UAE, Abu Dhabi, 1 GW, operated by G42.
Public suppliers: NVDA (gpu)
-
Google Van Buren Township (Project Cannoli), Van Buren Township, MI, 1 GW, operated by Panattoni Development Co..
Public suppliers: DTE (energy supplier)
-
AWS Salem Township Innovation Campus (Susquehanna), Salem Township, PA, 960 MW, operated by Amazon Web Services.
Public suppliers: TLN (energy supplier)
-
QTS Richmond, Sandston, VA, 921 MW, operated by QTS Data Centers.
Public suppliers: D (energy supplier)
-
AWS Zaragoza La Cartuja Baja Data Center Campus, Zaragoza, 850 MW, operated by Amazon Web Services.
Public suppliers: PRYMF (hv cable)
-
Three Mile Island Restart, Middletown, PA, 837 MW, operated by Constellation.
Public suppliers: EMR (power management)
-
Oracle AI Cloud Infrastructure (US), Ashburn, 800 MW, operated by Oracle.
Public suppliers: NVDA (gpu)
-
Childress Campus, Childress, TX, 750 MW, operated by IREN.
Public suppliers: GNRC (genset)
-
TeraWulf Lake Mariner Campus, Barker, NY, 750 MW, operated by TeraWulf.
Public suppliers: FLR (engineering)
-
Beacon Point, Robstown, TX, 704 MW, operated by Hut 8.
Public suppliers: AEP (energy supplier)
-
CoreWeave AI Data Centers (US), United States, 500 MW, operated by CoreWeave.
Public suppliers: NVDA (gpu)
-
Naver & NVIDIA Morocco AI Data Center (Tamesna), Tamesna, 500 MW, operated by Naver.
Public suppliers: NVDA (gpu)
-
SoftBank Tomakomai AI Data Center (Japan), Tomakomai, 300 MW, operated by SoftBank Corp..
Public suppliers: NVDA (gpu)
-
QTS Richmond 3, Sandston, VA, 240 MW, operated by QTS Data Centers.
Public suppliers: D (energy supplier)
-
QTS Richmond 1, Sandston, VA, 238 MW, operated by QTS Data Centers.
Public suppliers: D (energy supplier)
-
Humain AI Data Centers (Saudi Arabia), Riyadh, 200 MW, operated by Humain.
Public suppliers: AMD (gpu)
-
Cassava AI Data Center (Egypt), Cairo, 200 MW, operated by Cassava Technologies.
Public suppliers: NVDA (gpu)
-
Microsoft Project Osmium, West Des Moines, IA, 190 MW, operated by Microsoft.
Public suppliers: J (engineering)
-
QTS Richmond 2, Sandston, VA, 180 MW, operated by QTS Data Centers.
Public suppliers: D (energy supplier)
-
Alibaba Zhangbei, Zhangbei, 169 MW, operated by Alibaba Cloud.
Public suppliers: ABBNY (transformer switchgear)
-
Meta Huntsville, Huntsville, AL, 146 MW, operated by Meta.
Public suppliers: NEE (energy supplier)
-
Metrobloks Southfield, Southfield, MI, 100 MW, operated by Metrobloks.
Public suppliers: DTE (energy supplier)
-
Aurora Supercomputer, Argonne National Laboratory, Lemont, IL, 60 MW, operated by Argonne National Laboratory.
Public suppliers: INTC (silicon)
-
Cyberport AI Supercomputing Centre (AISC), Hong Kong, Cyberport, 50 MW, operated by Cyberport.
Public suppliers: NVDA (gpu)
-
Mistral Compute / Eclairion Bruyeres-le-Chatel AI Cluster, Bruyeres-le-Chatel, 44 MW, operated by Mistral AI.
Public suppliers: NVDA (gpu)
-
El Capitan Supercomputer, Lawrence Livermore National Laboratory, Livermore, CA, 30 MW, operated by Lawrence Livermore National Laboratory.
Public suppliers: AMD (gpu)
-
Ooredoo/Syntys AI Cloud Data Center (Qatar), Doha, 30 MW, operated by Ooredoo.
Public suppliers: NVDA (gpu)
-
Frontier Supercomputer, Oak Ridge National Laboratory, Oak Ridge, TN, 25 MW, operated by Oak Ridge National Laboratory.
Public suppliers: AMD (gpu)
-
Scaleway H100 AI Cloud Data Center (France), Saint-Ouen-l'Aumone, 24 MW, operated by Scaleway.
Public suppliers: NVDA (gpu)
-
Cassava AI Data Center (South Africa), Johannesburg, 20 MW, operated by Cassava Technologies.
Public suppliers: NVDA (gpu)
-
SDS “Open-Access” AI Supercomputer (Israel), Petah Tikva, 18 MW, operated by SDS (Shonfeld Data Services).
Public suppliers: NVDA (gpu)
-
JUPITER Exascale AI Data Center, Jülich, 10 MW, operated by Forschungszentrum Jülich.
Public suppliers: NVDA (gpu)
-
Oman Data Park AI Infrastructure, Muscat, 10 MW, operated by Oman Data Park.
Public suppliers: NVDA (gpu)
-
Discoverer+ AI Supercomputer Upgrade, Sofia, 2 MW, operated by Sofia Tech Park.
Public suppliers: NVDA (gpu)
-
Calvert Cliffs Relicense, Lusby, MD, operated by Constellation.
Public suppliers: EMR (power management)
-
Diablo Canyon AI Integration Project, Avila Beach, CA, operated by Pacific Gas and Electric Company (PG&E).
Public suppliers: EMR (power management)
-
AIST ABCI-3 Supercomputer (Japan), Tsukuba, operated by National Institute of Advanced Industrial Science and Technology (AIST).
Public suppliers: NVDA (gpu)
-
Cassava AI Data Center (Morocco), Casablanca, operated by Cassava Technologies.
Public suppliers: NVDA (gpu)
-
Google Fort Wayne Data Center (Project Zodiac), Fort Wayne, IN, operated by Google.
Public suppliers: AEP (energy supplier)
-
OpenAI Stargate U.S. Infrastructure Program, United States, operated by OpenAI.
Public suppliers: NVDA (gpu)
-
Cassava AI Data Center (Nigeria), Lagos, operated by Cassava Technologies.
Public suppliers: NVDA (gpu)
-
Microsoft Gaines Township, Gaines Township, MI, operated by Microsoft.
Public suppliers: CMS (energy supplier)
-
Project Flex (Verrus / Sidewalk Infrastructure Partners), Lyon Township, Lyon Township, MI, operated by Verrus (Sidewalk Infrastructure Partners).
Public suppliers: DTE (energy supplier)
-
Meta Bowling Green, Bowling Green, OH, operated by Meta.
Public suppliers: FE (energy supplier)