Oasis Digital Russell County Campus (Moss No. 3)
AI data center in Cleveland, VA, United States: announced.
- Location: Cleveland, VA, United States
- Developer: Oasis Digital Properties
- Status: announced
Oasis Digital Russell County Campus (Moss No. 3) is a AI data center project located in Cleveland, VA, United States, currently announced. It is being built by Oasis Digital Properties. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Oasis Digital Properties has a contract with the Russell County IDA to develop the 236-acre former Moss No. 3 coal-mine site for 3-4 data center buildings; Appalachian Power has 300 MW available with the first 100 MW in 18 months. No tenant and no ground broken.
Related data center projects
- Oasis Digital Greensville Campus (MAMaC Megasite), Emporia, VA, United States · announced
- Dahlgren West, Dahlgren, VA, United States · permitted
- Creekstone Delta Gigasite, 10.0 GW, Delta, UT, United States · under construction
- Stratos Hyperscale Data Center, 9.0 GW, Hansel Valley, UT, United States · announced
- PORTS-Pike Technology Campus, 8.0 GW, Piketon, OH, United States · under construction
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Meta Hyperion, 5.0 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5.0 GW, Laredo, TX, United States · announced