Oasis Digital Greensville Campus (MAMaC Megasite)
1.2 GW AI data center in Greensville County, VA, United States: permitted.
- Capacity: 1.2 GW
- Location: Greensville County, VA, United States
- Developer: Oasis Digital Properties
- Status: permitted
Oasis Digital Greensville Campus (MAMaC Megasite) is a 1.2 GW AI data center project located in Greensville County, VA, United States, currently permitted. It is being built by Oasis Digital Properties. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Oasis Digital is developing a data center campus on part of the 1,600-acre MAMaC megasite in Greensville County, with grid power from Dominion and onsite gas generation of up to 300 MW in development (power figures, not campus IT load).
Related data center projects
- Wise Innovation Hub (Lonesome Pine), Wise County, VA, United States · announced
- Oasis Digital Russell County Campus (Moss No. 3), Cleveland, VA, United States · announced
- Dahlgren West, Dahlgren, VA, United States · permitted
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
Frequently asked questions
- What is Oasis Digital Greensville Campus (MAMaC Megasite)?
- Oasis Digital Greensville Campus (MAMaC Megasite) is an AI data center project in Greensville County, Virginia tracked by Data Center Index. Its status is permitted.
- Where is Oasis Digital Greensville Campus (MAMaC Megasite)?
- Oasis Digital Greensville Campus (MAMaC Megasite) is in Greensville County, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- How big is Oasis Digital Greensville Campus (MAMaC Megasite)?
- Data Center Index tracks Oasis Digital Greensville Campus (MAMaC Megasite) at 1.2 GW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Oasis Digital Greensville Campus (MAMaC Megasite)?
- Oasis Digital Properties is developing Oasis Digital Greensville Campus (MAMaC Megasite).
Sources
- Economic Powerhouse for Greensville County, VA (oasisdigital.us · press · 2026-10-30)
- Projects (oasisdigital.us · press · 2026-09-25)
- Greensville County Board of Supervisors Minutes, January 5, 2026 (greensvillecountyva.gov · public record · 2026-01-05)
- greensvillecountyva.gov (public record · 2026-01-05)
- citizenportal.ai (press · 2026-01-05)
- Virginia's Gateway Region (gatewayregion.com · press · 2026-10-30)