AEP Hilliard Fuel Cell Plant is a 73 MW data center power project located in Hilliard, OH, United States, currently permitted. It is being built by AEP Ohio for tenant Amazon Web Services. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Ohio.

Project description

AEP won Ohio Power Siting Board approval in September 2025 to install 228 Bloom Energy fuel cells, a 72.9 megawatt solid oxide fuel cell facility, at the Amazon Web Services campus off Scioto Darby Road in Hilliard. The city dropped its appeal of the state air permit in September 2026.

Public companies linked to AEP Hilliard Fuel Cell Plant

Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:

Related data center projects

Frequently asked questions

What is AEP Hilliard Fuel Cell Plant?
AEP Hilliard Fuel Cell Plant is a power generation asset feeding AI data center demand in Hilliard, Ohio tracked by Data Center Index. Its status is permitted.
Where is AEP Hilliard Fuel Cell Plant?
AEP Hilliard Fuel Cell Plant is in Hilliard, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
How big is AEP Hilliard Fuel Cell Plant?
Data Center Index tracks AEP Hilliard Fuel Cell Plant at 73 MW. The developer or the press states that capacity. This entry is a power generation asset, not a data center hall.
Who is building AEP Hilliard Fuel Cell Plant?
AEP Ohio is developing AEP Hilliard Fuel Cell Plant, with Amazon Web Services named as the tenant.
Which public companies are linked to AEP Hilliard Fuel Cell Plant?
Data Center Index links 3 tracked public companies to AEP Hilliard Fuel Cell Plant: American Electric Power (AEP), Amazon (AMZN), Bloom Energy (BE). Each is a developer, tenant or supplier with a sourced link to the project.

Sources

  1. Hilliard drops appeal on permit for natural gas fuel cells for data center (wosu.org · press · 2026-09-16)