AEP Hilliard Fuel Cell Plant
73 MW data center power project in Hilliard, OH, United States: permitted.
Updated
- Capacity: 73 MW
- Location: Hilliard, OH, United States
- Developer: AEP Ohio
- Tenant: Amazon Web Services
- Status: permitted
AEP Hilliard Fuel Cell Plant is a 73 MW data center power project located in Hilliard, OH, United States, currently permitted. It is being built by AEP Ohio for tenant Amazon Web Services. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Ohio.
Project description
AEP won Ohio Power Siting Board approval in September 2025 to install 228 Bloom Energy fuel cells, a 72.9 megawatt solid oxide fuel cell facility, at the Amazon Web Services campus off Scioto Darby Road in Hilliard. The city dropped its appeal of the state air permit in September 2026.
Public companies linked to AEP Hilliard Fuel Cell Plant
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- American Electric Power (AEP), developer · energy
- Amazon (AMZN), tenant · hyperscaler
- Bloom Energy (BE), energy supplier · energy · high DC exposure
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, DeSoto County, FL, United States · permitted
Frequently asked questions
- What is AEP Hilliard Fuel Cell Plant?
- AEP Hilliard Fuel Cell Plant is a power generation asset feeding AI data center demand in Hilliard, Ohio tracked by Data Center Index. Its status is permitted.
- Where is AEP Hilliard Fuel Cell Plant?
- AEP Hilliard Fuel Cell Plant is in Hilliard, Ohio. Every tracked Ohio campus, with counts and capacity, is at https://datacenterindex.ai/markets/ohio.
- How big is AEP Hilliard Fuel Cell Plant?
- Data Center Index tracks AEP Hilliard Fuel Cell Plant at 73 MW. The developer or the press states that capacity. This entry is a power generation asset, not a data center hall.
- Who is building AEP Hilliard Fuel Cell Plant?
- AEP Ohio is developing AEP Hilliard Fuel Cell Plant, with Amazon Web Services named as the tenant.
- Which public companies are linked to AEP Hilliard Fuel Cell Plant?
- Data Center Index links 3 tracked public companies to AEP Hilliard Fuel Cell Plant: American Electric Power (AEP), Amazon (AMZN), Bloom Energy (BE). Each is a developer, tenant or supplier with a sourced link to the project.
Sources
- Hilliard drops appeal on permit for natural gas fuel cells for data center (wosu.org · press · 2026-09-16)
- City of Hilliard (hilliardohio.gov · public record · 2026-09-16)