Metrobloks Southfield
100 MW AI data center in Southfield, MI, United States — permitted.
- Capacity: 100 MW
- Location: Southfield, MI, United States
- Developer: Metrobloks
- Status: permitted
- Estimated cost: $1.5B
Metrobloks Southfield is a 100 MW AI data center project located in Southfield, MI, United States, currently permitted. It is being built by Metrobloks. The estimated build cost is $1.5B. This project is one of thousands of data-center facilities tracked by Data Center Index across MI, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Southfield City Council approved (5-2) Metrobloks' site plan for a 100 MW, 109,683 sq ft data center with closed-loop cooling on 12.19 acres on Inkster Rd between 11 Mile and I-696; $1.5B in two phases; financing contingent on securing a tenant.
Related data center projects
- Project Matador (Fermi America HyperGrid) — 17.0 GW, Amarillo, TX, United States · under construction
- PORTS Technology Campus (Piketon) — 10.0 GW, Piketon, OH, United States · under construction
- Creekstone Delta Gigasite — 10.0 GW, Delta, UT, United States · permitted
- Stratos Hyperscale Data Center — 9.0 GW, Hansel Valley, UT, United States · permitted
- Nexus Hubbard Campus — 7.2 GW, Hubbard, TX, United States · under construction
- Data City Texas — 5.0 GW, Laredo, TX, United States · announced
- Homer City Energy Campus — 4.5 GW, Homer City, PA, United States · under construction
- DCIP Group DeSoto County AI Data Center Campus — 4.0 GW, Arcadia, FL, United States · permitted