Metrobloks

Tracked AI data center portfolio for Metrobloks: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does Metrobloks have?
Data Center Index tracks 2 data center campuses with Metrobloks named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does Metrobloks have?
100 MW across 2 tracked campuses, counting operating and pipeline sites together. Of the 1 Metrobloks campus with a capacity figure, 0 are filed, 0 stated and 1 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does Metrobloks build data centers?
Tracked Metrobloks campuses sit in 2 markets: MI (1), MO (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest Metrobloks data center?
Metrobloks Southfield in MI is the largest tracked Metrobloks campus at 100 MW, currently permitted. That capacity is an estimate. We modeled or inferred it, and no source states it.