Google Botetourt (Botetourt Center at Greenfield)
300 MW AI data center in Daleville, VA, United States: under construction.
- Capacity: 300 MW
- Location: Daleville, VA, United States
- Developer: Google
- Status: under construction
- Estimated cost: $3B
Google Botetourt (Botetourt Center at Greenfield) is a 300 MW AI data center project located in Daleville, VA, United States, currently under construction. It is being built by Google. The estimated build cost is $3B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Google got a Land Disturbance Permit from Botetourt County to begin phased grading on its 312-acre site inside the Botetourt Center at Greenfield, and contractors said grading would start after Labor Day. Virginia Business (2026-07-24) describes a $3 billion, three-building campus whose first building will be air-cooled.
Related data center projects
- Google Project Tembo (Cheyenne), 1.8 GW, Cheyenne, WY, United States · permitted
- Google Project Spade (New Florence), 1.2 GW, New Florence, MO, United States · under construction
- Google Project Mica, 700 MW, Kansas City, MO, United States · under construction
- Google Fredericia (Taulov) AI Data Center, 550 MW, Fredericia, Denmark · operational
- Google-Kairos Power AI Data Center Initiative, 500 MW, Oak Ridge, TN, United States · announced
- Haskell County Campus, 440 MW, Haskell, TX, United States · under construction
- Google Eemshaven AI Data Center, 400 MW, Eemshaven, Netherlands · operational
- Google LaGrange (Project Pegasus), 400 MW, LaGrange, GA, United States · under construction
Frequently asked questions
- What is Google Botetourt (Botetourt Center at Greenfield)?
- Google Botetourt (Botetourt Center at Greenfield) is an AI data center project in Daleville, Virginia tracked by Data Center Index. Its status is under construction.
- Where is Google Botetourt (Botetourt Center at Greenfield)?
- Google Botetourt (Botetourt Center at Greenfield) is in Daleville, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- How big is Google Botetourt (Botetourt Center at Greenfield)?
- Data Center Index tracks Google Botetourt (Botetourt Center at Greenfield) at 300 MW, on an estimated $3B build. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building Google Botetourt (Botetourt Center at Greenfield)?
- Google is developing Google Botetourt (Botetourt Center at Greenfield).
- When will Google Botetourt (Botetourt Center at Greenfield) come online?
- The next building at Google Botetourt (Botetourt Center at Greenfield) is expected online December 31, 2028. That date is the first building going live, not the full build-out.
Sources
- Grading to begin for Google Data Center Campus in Botetourt County (wsls.com · press · 2026-08-28)
- Cardinal News (cardinalnews.org · press · 2026-09-03)
- Virginia Business (virginiabusiness.com · press · 2026-02-04)
- Google Data Center Campus in Botetourt Center at Greenfield (botetourtva.gov · public record · 2026-10-17)
- cardinalnews.org (press · 2026-09-16)
- WDBJ7 (wdbj7.com · press · 2026-09-03)