Southgate Melbourne
57 MW AI data center in Australia — operational.
- Capacity: 57 MW
- Location: Australia
- Developer: Firmus
- Status: operational
- Estimated cost: $1.6B
Southgate Melbourne is a 57 MW AI data center project located in Australia, currently operational. It is being built by Firmus. The estimated build cost is $1.6B. This project is one of thousands of data-center facilities tracked by Data Center Index across Australia — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 41 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Related data center projects
- Microsoft — Australia AI Expansion — 1.0 GW, Sydney, Melbourne, Canberra, Australia · operational
- AirTrunk — MEL2 Melbourne — 354 MW, Melbourne, Australia · announced
- Microsoft — Kemps Creek AI Campus (Sydney) — 190 MW, Sydney, Australia · under construction
- NEXTDC — M4 Melbourne 'AI Factory' — 160 MW, Melbourne, Australia · under construction
- Google — Christmas Island AI Data Node — 7 MW, Flying Fish Cove, Australia · announced