QTS Richmond 2
252 MW AI data center in Sandston, VA, United States — operational.
- Capacity: 252 MW
- Location: Sandston, VA, United States
- Status: operational
- Estimated cost: $6.8B
QTS Richmond 2 is a 252 MW AI data center project located in Sandston, VA, United States, currently operational.. The estimated build cost is $6.8B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 180 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Public companies linked to QTS Richmond 2
Developers, tenants, and suppliers tracked by Data Center Index with exposure to this project:
- Dominion Energy (D) — energy supplier · energy · mid DC exposure
Related data center projects
- QTS Cedar Rapids — 1.6 GW, Fairfax, IA, United States · operational
- QTS Richmond — 921 MW, Sandston, VA, United States · operational
- STACK Infrastructure NVA02 — 487 MW, Manassas, VA, United States · operational
- QTS Richmond 3 — 336 MW, Sandston, VA, United States · operational
- QTS Richmond 1 — 333 MW, Sandston, VA, United States · announced
- Stream Phoenix — 267 MW, AZ, United States · operational
- Vantage TX1 — 179 MW, San Antonio, TX, United States · under construction
- Nexus Hubbard Campus — 7.2 GW, Hubbard, OH, United States · under construction