QTS Richmond
921 MW AI data center in Sandston, VA, United States — operational.
- Capacity: 921 MW
- Location: Sandston, VA, United States
- Status: operational
- Estimated cost: $32.7B
QTS Richmond is a 921 MW AI data center project located in Sandston, VA, United States, currently operational.. The estimated build cost is $32.7B. This project is one of thousands of data-center facilities tracked by Data Center Index across VA, United States — covering operational, under-construction, announced, and permitted sites.
Notes
Epoch 'Current power' = 854 MW (may include campus expansions); Cost modeled at ~$44B/GW by Epoch AI
Linked public companies
- Dominion Energy (D) — energy supplier