Texas Data Centers
Live tracking of every data center project in Texas — operational, under construction, announced, and permitted — with developer, tenant, capacity, and supply-chain links.
- Operating: 212
- Under construction: 140
- Announced: 610
- Operating capacity: 9.1 GW
- Pipeline capacity: 6.5 GW
- Grid: ERCOT
Texas is one of the most active data center markets in the United States — 212 facilities are already operating, with 140 more under construction and 610 announced. That pipeline represents 6.5 GW of new capacity. The grid here is operated by ERCOT, which sets the interconnection queue and capacity payments. Below: every tracked project in Texas, ranked by build status; followed by the public companies whose data-center revenue is most exposed to this market.
Tracked data center projects in Texas
- El Paso DC — 1.0 GW, El Paso · operational · developer: Meta · ~$10.0B
- OpenAI Stargate Abilene — 1.2 GW, Abilene · operational · developer: Oracle · tenant: OpenAI · ~$8.1B
- Meta Temple — 238 MW, Temple · operational · developer: Meta · ~$5.8B
- CoreWeave Denton TX — 367 MW, Denton · operational · developer: CoreWeave · ~$2.9B
- OpenAI Stargate Shackelford — 2.0 GW, Abilene · operational · developer: Oracle · tenant: OpenAI
- OpenAI Stargate Milam — 1.2 GW · operational · developer: Softbank · tenant: OpenAI
- Goodnight — 1.1 GW, Claude · operational · developer: Google · tenant: Google DeepMind
- Crusoe Abilene Expansion — 941 MW, Abilene · operational · developer: Microsoft
- Coreweave Helios — 800 MW, Afton · operational · developer: Coreweave · tenant: Microsoft
- Microsoft — San Antonio, Texas AI Data Center Campus — 300 MW, San Antonio · operational · developer: Microsoft
- Goodnight Campus — 1.0 GW, Claude · under construction · developer: Crusoe · ~$29.0B
- Frontier Campus — 1.4 GW · under construction · developer: Vantage · ~$25.0B
- Taylor Fab, Taylor · under construction · developer: Samsung · ~$17.0B
- Sweetwater Campus — 600 MW, Sweetwater · under construction · developer: IREN · tenant: Microsoft · ~$2.0B
- Childress Campus — 300 MW, Childress · under construction · developer: IREN · ~$1.5B
- Stargate I — 1.2 GW, Abilene · under construction · developer: Crusoe · tenant: OpenAI
- Garland Campus — 200 MW, Dallas · under construction · developer: Digital Realty
- Wilbarger Campus — 800 MW, Vernon · announced · developer: Google
- Haskell County Campus — 440 MW · announced · developer: Google
- Stargate Shackelford County, Shackelford County · announced · developer: Oracle · tenant: OpenAI
Public companies exposed to Texas
These public companies have tracked data-center projects in Texas as developers, tenants, or operators. Use the watchlist to track them as a basket, or click through for capex history and supplier exposure.
- OpenAI (OPENAI) — ai lab · 5 projects in Texas
- GE Vernova (GEV) — power equipment · 4 projects in Texas
- Microsoft (MSFT) — hyperscaler · 4 projects in Texas
- Powell Industries (POWL) — power equipment · 4 projects in Texas
- Caterpillar (CAT) — power equipment · 3 projects in Texas
- Alphabet (GOOGL) — hyperscaler · 3 projects in Texas
- Oracle (ORCL) — hyperscaler · 3 projects in Texas
- Primoris Services (PRIM) — construction · 3 projects in Texas
- SK Hynix (000660.KS) — chip fab · 2 projects in Texas
- Crusoe (CRUSOE) — gpu cloud · 2 projects in Texas
- CoreWeave (CRWV) — gpu cloud · 2 projects in Texas
- IREN (IREN) — gpu cloud · 2 projects in Texas
- Meta Platforms (META) — hyperscaler · 2 projects in Texas
- Micron Technology (MU) — chip fab · 2 projects in Texas
- Arista Networks (ANET) — networking · 1 project in Texas