STACK POR01 Hillsboro Campus
80 MW AI data center in Hillsboro, OR, United States: operational.
Updated
- Capacity: 80 MW
- Location: Hillsboro, OR, United States
- Developer: STACK Infrastructure
- Status: operational
STACK POR01 Hillsboro Campus is an 80 MW AI data center project located in Hillsboro, OR, United States, currently operational. It was developed by STACK Infrastructure. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Oregon.
Project description
STACK's POR01 page describes an 80MW Hillsboro campus on 18 acres with two buildings (POR01A 5MW, POR01B 72MW), including a 36MW future expansion. Status: July 2022 coverage says STACK "owns POR01, a 12MW facility" in the area; the 36 MW expansion on the current page is future.
Related data center projects
- STACK Infrastructure Berry Hill (Southern Virginia Megasite), 3 GW, Danville, VA, United States · announced
- STACK Stafford Technology Campus (STC), 1.1 GW, Stafford County, VA, United States · under construction
- STACK Infrastructure NVA02, 420 MW, Prince William County, VA, United States · operational
- STACK DFW02 Lancaster, 312 MW, Lancaster, TX, United States · under construction
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK POR03 Hillsboro Campus, 200 MW, Hillsboro, OR, United States · operational
- STACK Loudoun County Campus, 180 MW, Arcola, VA, United States · announced
Frequently asked questions
- What is STACK POR01 Hillsboro Campus?
- STACK POR01 Hillsboro Campus is an AI data center project in Hillsboro, Oregon tracked by Data Center Index. Its status is operational.
- Where is STACK POR01 Hillsboro Campus?
- STACK POR01 Hillsboro Campus is in Hillsboro, Oregon. Every tracked Oregon campus, with counts and capacity, is at https://datacenterindex.ai/markets/oregon.
- How big is STACK POR01 Hillsboro Campus?
- Data Center Index tracks STACK POR01 Hillsboro Campus at 80 MW. The developer or the press states that capacity, in a source dated November 18, 2026.
- Who is building STACK POR01 Hillsboro Campus?
- STACK Infrastructure is developing STACK POR01 Hillsboro Campus.
Sources
- POR01 - Hillsboro - STACK Infrastructure (stackinfra.com · press · 2026-11-18)
- CommercialSearch (republishing STACK's release) (commercialsearch.com · press · 2026-11-18)