MI AI Data Center Projects
Every tracked AI data center project, grouped by build status. Operational, under construction, announced, and permitted — with developer, tenant, capacity, and cost details.
- Projects tracked: 9
- Operating: 1
- Under construction: 1
- Announced / permitted: 7
- Total capacity: 2.9 GW
- Estimated investment: ~$2.7B
-
OpenAI Stargate Michigan — 1.4 GW, Saline Township, MI, United States · developer: Related Digital · tenant: Oracle / OpenAI · under construction
-
Google Van Buren Township (Project Cannoli) — 1.0 GW, Van Buren Township, MI, United States · developer: Panattoni Development Co. · tenant: Google · permitted
-
Hyperscale Data Michigan AI Campus (Dowagiac) — 340 MW, Dowagiac, MI, United States · developer: Hyperscale Data (Sentinum / Alliance Cloud Services) · operational
-
Metrobloks Southfield — 100 MW, Southfield, MI, United States · developer: Metrobloks · permitted · ~$1.5B
-
University of Michigan / Los Alamos Ypsilanti Township Computing Center — 100 MW, Ypsilanti Township, MI, United States · developer: University of Michigan / Los Alamos National Laboratory · announced · ~$1.2B
-
Microsoft Gaines Township, Gaines Township, MI, United States · developer: Microsoft · announced
-
Microsoft Lowell Township (Covenant Business Park), Lowell Township, MI, United States · developer: Microsoft · announced
-
Microsoft Dorr Township, Dorr Township, MI, United States · developer: Microsoft · announced
-
Project Flex (Verrus / Sidewalk Infrastructure Partners), Lyon Township, Lyon Township, MI, United States · developer: Verrus (Sidewalk Infrastructure Partners) · permitted