Microsoft Dorr Township
AI data center in Dorr Township, MI, United States — announced.
- Location: Dorr Township, MI, United States
- Developer: Microsoft
- Status: announced
Microsoft Dorr Township is a AI data center project located in Dorr Township, MI, United States, currently announced. It is being built by Microsoft. This project is one of thousands of data-center facilities tracked by Data Center Index across MI, United States — covering operational, under-construction, announced, and permitted sites.
Project description
Microsoft plans a data center on ~272 acres it bought in 2024 for $48M+ off 144th Ave near US-131 in Dorr Township (128 acres to be developed); land already zoned commercial/industrial permitting a data center; no formal site plan submitted.
Related data center projects
- Microsoft Fairwater Wisconsin — 2.7 GW, Mount Pleasant, WI, United States · operational
- Microsoft Pecos (Reeves County) — 2.0 GW, Pecos, TX, United States · announced
- Azure Northern Virginia — 1.0 GW, Northern Virginia, VA, United States · operational
- Microsoft — Australia AI Expansion — 1.0 GW, Sydney, Melbourne, Canberra, Australia · operational
- Crusoe Abilene Expansion — 941 MW, Abilene, TX, United States · under construction
- Microsoft Fairwater Atlanta — 859 MW, Fayetteville, GA, United States · operational
- Microsoft — Lordstown AI Campus (Stargate Phase 1) — 600 MW, Lordstown, OH, United States · announced
- Microsoft — India AI Infrastructure (Hyderabad / Pune) — 600 MW, India · under construction