STACK Culpeper Technology Park (Keyser Road)
AI data center in Culpeper, VA, United States: announced.
Updated
- Location: Culpeper, VA, United States
- Developer: STACK Infrastructure
- Status: announced
STACK Culpeper Technology Park (Keyser Road) is an AI data center project located in Culpeper, VA, United States, currently announced. It is being built by STACK Infrastructure. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Virginia.
Project description
Greysteel's release says Stack bought a 71-acre site at 15140 Keyser Road, Culpeper, with by-right data center zoning and proximity to significant power, for about $66.4 million on 2026-08-06. No MW, design or construction start is stated.
Related data center projects
- STACK Infrastructure Berry Hill (Southern Virginia Megasite), 3 GW, Danville, VA, United States · announced
- STACK Stafford Technology Campus (STC), 1.1 GW, Stafford County, VA, United States · under construction
- STACK Infrastructure NVA02, 420 MW, Prince William County, VA, United States · operational
- STACK DFW02 Lancaster, 312 MW, Lancaster, TX, United States · under construction
- STACK PHX02 Central Phoenix, 250 MW, Phoenix, AZ, United States · announced
- STACK PHX01 Avondale, 225 MW, Avondale, AZ, United States · operational
- STACK POR03 Hillsboro Campus, 200 MW, Hillsboro, OR, United States · operational
- STACK Loudoun County Campus, 180 MW, Arcola, VA, United States · announced
Frequently asked questions
- What is STACK Culpeper Technology Park (Keyser Road)?
- STACK Culpeper Technology Park (Keyser Road) is an AI data center project in Culpeper, Virginia tracked by Data Center Index. Its status is announced.
- Where is STACK Culpeper Technology Park (Keyser Road)?
- STACK Culpeper Technology Park (Keyser Road) is in Culpeper, Virginia. Every tracked Virginia campus, with counts and capacity, is at https://datacenterindex.ai/markets/virginia.
- Who is building STACK Culpeper Technology Park (Keyser Road)?
- STACK Infrastructure is developing STACK Culpeper Technology Park (Keyser Road).
Sources
- Greysteel arranges $66.36 million sale of 71-acre data center development site in Culpeper, Virginia (greysteel.com · press · 2026-08-06)
- Data Center Dynamics (datacenterdynamics.com · press · 2026-08-06)