TerraWatt Riverbend Technology Center (former Alton Steel)

200 MW AI data center in Alton, IL, United States: announced.

Updated

TerraWatt Riverbend Technology Center (former Alton Steel) is a 200 MW AI data center project located in Alton, IL, United States, currently announced. It is being built by TerraWatt. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Illinois.

Project description

STLPR reports TerraWatt has a contingent agreement to buy the 5 Cut St. Alton Steel mill site for a Riverbend Technology Center starting at 200 MW, closing in 2027 subject to rezoning; the city says no formal permit application or zoning change has been made.

Related data center projects

Frequently asked questions

What is TerraWatt Riverbend Technology Center (former Alton Steel)?
TerraWatt Riverbend Technology Center (former Alton Steel) is an AI data center project in Alton, Illinois tracked by Data Center Index. Its status is announced.
Where is TerraWatt Riverbend Technology Center (former Alton Steel)?
TerraWatt Riverbend Technology Center (former Alton Steel) is in Alton, Illinois. Every tracked Illinois campus, with counts and capacity, is at https://datacenterindex.ai/markets/illinois.
How big is TerraWatt Riverbend Technology Center (former Alton Steel)?
Data Center Index tracks TerraWatt Riverbend Technology Center (former Alton Steel) at 200 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
Who is building TerraWatt Riverbend Technology Center (former Alton Steel)?
TerraWatt is developing TerraWatt Riverbend Technology Center (former Alton Steel).

Sources

  1. Alton data center proposal (stlpr.org · press · 2026-10-21)
  2. St. Louis Magazine (stlmag.com · press · 2026-10-21)