TerraWatt Riverbend Technology Center (former Alton Steel)
200 MW AI data center in Alton, IL, United States: announced.
Updated
- Capacity: 200 MW
- Location: Alton, IL, United States
- Developer: TerraWatt
- Status: announced
TerraWatt Riverbend Technology Center (former Alton Steel) is a 200 MW AI data center project located in Alton, IL, United States, currently announced. It is being built by TerraWatt. Data Center Index tracks it alongside the other operating, under-construction, announced and permitted sites in Illinois.
Project description
STLPR reports TerraWatt has a contingent agreement to buy the 5 Cut St. Alton Steel mill site for a Riverbend Technology Center starting at 200 MW, closing in 2027 subject to rezoning; the city says no formal permit application or zoning change has been made.
Related data center projects
- TerraWatt St. Louis Armory Data Center, 120 MW, St. Louis, MO, United States · permitted
- PORTS-Pike Technology Campus, 8 GW, Pike County, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hill County, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Box Elder County, UT, United States · announced
- Meta Hyperion, 5 GW, Richland Parish, LA, United States · under construction
- Data City Texas, 5 GW, Webb County, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Millard County, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Caldwell County, TX, United States · announced
Frequently asked questions
- What is TerraWatt Riverbend Technology Center (former Alton Steel)?
- TerraWatt Riverbend Technology Center (former Alton Steel) is an AI data center project in Alton, Illinois tracked by Data Center Index. Its status is announced.
- Where is TerraWatt Riverbend Technology Center (former Alton Steel)?
- TerraWatt Riverbend Technology Center (former Alton Steel) is in Alton, Illinois. Every tracked Illinois campus, with counts and capacity, is at https://datacenterindex.ai/markets/illinois.
- How big is TerraWatt Riverbend Technology Center (former Alton Steel)?
- Data Center Index tracks TerraWatt Riverbend Technology Center (former Alton Steel) at 200 MW. That capacity is an estimate. We modeled or inferred it, and no source states it.
- Who is building TerraWatt Riverbend Technology Center (former Alton Steel)?
- TerraWatt is developing TerraWatt Riverbend Technology Center (former Alton Steel).
Sources
- Alton data center proposal (stlpr.org · press · 2026-10-21)
- St. Louis Magazine (stlmag.com · press · 2026-10-21)