TerraWatt

Tracked AI data center portfolio for TerraWatt: live capex history, supplier exposure, and project map.

Projects

Frequently asked questions

How many data centers does TerraWatt have?
Data Center Index tracks 1 data center campus with TerraWatt named as the developer or the tenant. Coverage is named campuses with a published source, not every building.
How much data center capacity does TerraWatt have?
120 MW across 1 tracked campus, counting operating and pipeline sites together. Of the 1 TerraWatt campus with a capacity figure, 0 are filed, 1 stated and 0 estimated. Filed means a permit, utility filing or SEC filing states the figure. Stated means the developer or the press states it. Estimated means we modeled or inferred it, and the site marks it "est.".
Where does TerraWatt build data centers?
Tracked TerraWatt campuses sit in 1 market: MO (1). The figure in brackets is how many campuses Data Center Index tracks in each.
What is the largest TerraWatt data center?
TerraWatt St. Louis Armory Data Center in MO is the largest tracked TerraWatt campus at 120 MW, currently permitted. The developer or the press states that capacity, in a source dated September 15, 2026.