Microsoft Union City Campus
324 MW AI data center in Union City, GA, United States: under construction.
- Capacity: 324 MW
- Location: Union City, GA, United States
- Developer: EdgeConneX / TA Realty
- Tenant: Microsoft
- Status: under construction
- Estimated cost: $1.8B
Microsoft Union City Campus is a 324 MW AI data center project located in Union City, GA, United States, currently under construction. It is being built by EdgeConneX / TA Realty for tenant Microsoft. The estimated build cost is $1.8B. This project is one of thousands of data-center facilities tracked by Data Center Index across GA, United States, covering operational, under-construction, announced, and permitted sites.
Project description
Microsoft bought 136 acres in Union City for $53.5M, and the campus there will have three roughly identical data center buildings. Phase 1 is 612,000 sq ft and the whole campus tops 2M sq ft, at 324 MW total. TA Realty and EdgeConneX are leading the $1.842B investment. Phase 1 construction began in late 2024 with the building online in 2026, and full completion is expected in 2029 against a 2032 deadline. A $75M tax abatement was approved.
Related data center projects
- PORTS-Pike Technology Campus, 8 GW, Piketon, OH, United States · announced
- Nexus Hubbard Campus, 7.7 GW, Hubbard, TX, United States · under construction
- Stratos Hyperscale Data Center, 7.5 GW, Snowville, UT, United States · announced
- Meta Hyperion, 5 GW, Holly Ridge, LA, United States · under construction
- Data City Texas, 5 GW, Laredo, TX, United States · announced
- Creekstone Delta Gigasite, 4.6 GW, Delta, UT, United States · under construction
- Tract Caldwell Valley Technology Park, 4 GW, Uhland, TX, United States · announced
- DCIP Group DeSoto County AI Data Center Campus, 4 GW, Arcadia, FL, United States · permitted
Frequently asked questions
- What is Microsoft Union City Campus?
- Microsoft Union City Campus is an AI data center project in Union City, Georgia tracked by Data Center Index. Its status is under construction.
- Where is Microsoft Union City Campus?
- Microsoft Union City Campus is in Union City, Georgia. Every tracked Georgia campus, with counts and capacity, is at https://datacenterindex.ai/markets/georgia.
- How big is Microsoft Union City Campus?
- Data Center Index tracks Microsoft Union City Campus at 324 MW, on an estimated $1.8B build. The developer or the press states that capacity, in a source dated July 19, 2024.
- Who is building Microsoft Union City Campus?
- EdgeConneX / TA Realty is developing Microsoft Union City Campus, with Microsoft named as the tenant.
Sources
- Details Emerge On Microsoft's $1.8 Billion Investment In Atlanta Data Centers Amid Tax, Development Wrangles (datacenterfrontier.com · press · 2024-07-18)
- Commercial Property Executive (commercialsearch.com · press · 2024-07-19)
- Connect CRE (connectcre.com · press · 2024-07-19)
- The Atlanta Journal-Constitution (ajc.com · press · 2026-08-06)
- The Atlanta Journal-Constitution (ajc.com · press · 2024-07-19)
- datacenterdynamics.com (press · 2024-07-19)